Second Quarter 2022 SPEC ACCEL Results

These results have been submitted to SPEC; see the disclaimer before studying any results.

Last update: Thursday, 30 June 2022, 11:44

Published Results (1):

OpenACC | OpenCL | OpenMP |


OpenACC (0):

No results.

OpenCL (1):

Test Sponsor System Name Accelerator Name Results Energy
Base Peak Base Peak
Telecommunications Technology Association KR580S2
HTML | CSV | Text | PDF | PS | Config
NVIDIA Tesla A100-PCIE-40GB 15.0 Not Run -- --

OpenMP (0):

No results.

[Back to ACCEL Results]

W3C XHTML 1.0
W3C CSS