First Quarter 2023 SPEC OMP2012 Results

These results have been submitted to SPEC; see the disclaimer before studying any results.

Last update: Monday, 20 March 2023, 12:47

Published Results (5):


OMPG2012 (5):

[Search in OMPG2012 results]

Test Sponsor System Name Base
Threads
Processor Results Energy
Enabled
Cores
Enabled
Chips
Cores/
Chip
Threads/
Core
Base Peak Base Peak
Cisco Systems Cisco UCS X210c M7 (Intel Xeon Platinum 8490H)
HTML | CSV | Text | PDF | PS | Config
240 120 2 60 2 56.2 56.4 -- --
Lenovo Global Technology ThinkSystem SR655 V3 (AMD EPYC 9654P)
HTML | CSV | Text | PDF | PS | Config
192 192 1 96 2 47.5 48.4 -- --
Supermicro SuperServer SYS-221H-TNR (Intel Xeon Platinum 8490H)
HTML | CSV | Text | PDF | PS | Config
240 120 2 60 2 58.6 58.9 -- --
xFusion FusionServer 2288H V7 (Intel Xeon Platinum 8480+, 2.0 GHz)
HTML | CSV | Text | PDF | PS | Config
224 112 2 56 2 61.0 Not Run  -- --
xFusion FusionServer 2288H V7 (Intel Xeon Platinum 8490H, 1.90 GHz)
HTML | CSV | Text | PDF | PS | Config
240 120 2 60 2 61.3 Not Run  -- --

[Back to OMP2012 Results]

W3C XHTML 1.0
W3C CSS